Electrical facilities included for the TV unit station
The delivery material is approximately of two months to three months
If the selected product is specified that comes in two types of finishes the customer needs to inform of the type of desire finish under notes during the purchase process
el shop drawing es conceptual y preliminar
Ideal for both walls and ceilings
Dra. Paola Lindenmann Sanz station Electrical facilities included for theInvoice #1377 Dra. Paola Lindenmann Sanz (60% Deposit Proposal Contract 1036 2026). SALEPERSON Proposal NUMBER Project SHIPPED VIA F. O. B. POINT TERMS Javier Rivera 1036 2026 QUANTITY DESCRIPTION UNIT PRICE TOTAL 4,800 SQ. FT. Construction of New Ceiling Fascia at Master Bathroom $7. 00 $33,600. 00 1 3D Render Desing Residence Front Facade $2,000. 00 $2,000. 00 SUBTOTAL $35,600. 00 Sales Tax 11. 5% $4,094. 00 Total $39,694. 00 60% Deposit $23,816. 40